Step 01
Choose your model
Pick the layout that fits your plot and your family.
YouStep 02
Configure it online
Facade, windows, layout, finishes. The price updates as you go.
YouStep 03
Send it to us
One click. We check that your plot can be reached.
You, then usStep 04
Get your formal offer
It arrives by email with the technical specification and full details.
UsStep 05
Pay the design deposit
Accept the offer. The design work for your permit begins.
YouStep 06
Your architect gets the permit
We don’t apply for permits. Your local architect does, with our drawings.
Your architect, with us- We provide full modular drawings: architectural, structural, MEP, fire and energy efficiency.
- They prepare the technical drawings and apply for the build permit.
- Sometimes a local code or site condition calls for a small change to our standard drawings. Your architect flags it and we update the drawings together.
Step 07
Sign the contract
Once the permit is issued. You commit to a build that is already approved.
You and usStep 08
We build and deliver
Made in 120 days from confirmation of your manufacturing slot, delivered in 5–7 working days, then assembled on your plot.
UsWho does what.
We Modular
- Modular drawings for your architect
- Updating drawings when a local code or site condition calls for a change
- Manufacturing drawings, build and delivery
- Assembly on your plot
Your local architect
- Full technical drawings for the permit
- Applying for the build permit
- Amending drawings with us where needed
You
- Choose and configure your model
- Confirm your plot and site access
- Accept the offer and pay the design deposit
- Arrange foundations, groundworks and utility lines (not in our packages)
How long it takes.
120 daysManufacturing time, from confirmation of your manufacturing slot.
5–7 daysWorking days for delivery in Central and Eastern Europe. Other locations vary.
90%Of your home is finished in the factory before it leaves.
Questions about the process.
No. Your local architect obtains the build permit. Once you accept our offer and pay the design deposit, we give your architect a full set of modular drawings covering architecture, structure, MEP, fire safety and energy efficiency. They turn these into the technical drawings for the permit application. Local building codes or site conditions sometimes call for small adaptations to our standard drawings; when that happens, your architect gives us feedback and we update the drawings together. We sign the contract after the permit has been issued.
Yes — a few country-specific items sit outside our quoted price, since they depend on your plot and local rules: land surveyor fees, a soil (geotechnical) study, and the energy performance certificate are usually arranged by your architect and billed separately. Some countries also require a specific independent professional for quality assurance or site supervision during the build — for example, an independent kwaliteitsborger under the Dutch Wkb law, or a certified Baumeister in Austria, Germany and Switzerland. Depending on how your project is set up, that may need to be arranged (and paid for) by us rather than by you, which is also outside our quoted price. We confirm exactly what applies to your country, and what it costs, in your formal offer.
In short, yes, with a local architect who understands the process for a temporary structure permit. In that case we don’t permanently secure the modules to the foundation, so the home can be dismantled and relocated if you wish.
We manufacture your home in 120 days from confirmation of your manufacturing slot. Delivery usually takes 5 to 7 working days in Central and Eastern Europe. For other locations it depends on the destination.
Most buyers finance through a standard mortgage or construction loan, the same way they would for a traditional new-build. Our fixed pricing and certification paperwork make that process straightforward.
Ready to start?
Configure it online in a few minutes and send it to us. We’ll come back to you with an offer.